Model 2160 Series Getting Started Guide
Introduction
This chapter contains information for planning the installation of the Model 2160 with the following installa-
tion procedures:
•
"Unpacking the Model 2160"
•
"Connecting cables"
•
"Grounding the Model 2160 and connecting power"
power source
Planning the installation
Before beginning the actual installation, we strongly recommend that you gather all the information you will
need to install and set up the device.
•
Create a network diagram
•
Gather IP related information
•
Install the hardware and software needed to configure the Model 2160
•
Verify power source reliability
When you finish preparing for your installation, go to section
install the device.
Introduction
on page 29 lists the contents of the shipping box
on page 29 describes how to install the port cables
on page 30 describes how to ground and connect the
"Installing the Model 2160"
3 • Hardware installation
on page 29 to
27