Nibe AP-AW10 Operating Manual page 24

Air/water compact heat pumps
Table of Contents

Advertisement

attentIon
do not exceed a pressure of 2.5 bar when rins-
ing the unit. The drain line of the heating circuit
safety valve must be closed before rinsing and
filling.
notICe.
Rinse heat pump and heating circuit for about 5
minutes.
Ap-AW10-12c
1 filling and emptying valve
during this process, turn the lever of the switching
valve used for the hot water circuit counter-
clockwise. press the reset button and rinse for
approx. 1 minute...
1 switching valve
1 Reset button
2 move the lever on the top of the
switching valve from right to top
24
NIBE
AP-AW10
TM
We reserve the right to make technical changes
After completion of this procedure move the
lever of the switching valve for the hot water
circuit
clockwise
to
To do so, press the reset button...
1 Reset button
2 move the lever on the top of the
switching valve from top to right
bleed the heating circuit and hot water circuit...
Ap-AW10-12c
1 bleed valve
1 permanent bleeder
If no further steps follow, install the bottom front
panel.
83050406cUK – Translation of the operating manual
the
starting
position.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-aw10-6cAp-aw10-8cAp-aw10-10cAp-aw10-12c

Table of Contents