How To Install - Orion OPM-4250 User Manual

Mpdp
Table of Contents

Advertisement

OPM-4250 | OPM-4250R
2.

How to install

 y
Installthissetonlyatalocationwhereadequateventilationisavailable.
How to assemble handles
1. Product is packed in a box as shown in Figure 1.
2. Please carefully remove the Packing Bag with a knife or a pair of scissors.
※ P leasecheckfrontandrearsidebeforeyoucutthebagtopreventanydamages
onpanelorset.
[Figure1]
3. Please assemble handles with the bolts that are in the accessory box to the
rear side as shown in the figure.
[Figure3]
PackingBag
Panelprotection
[Figure2]
Handles
[Figure4]
- 12 -
Infinitely Expandable
How to move MPDP
1. 2 people hold each handle on product's back side.
Panelprotection
Handles
2. It needs two people to carry or install this product.
Pleaseholdthehandlesinthebackandthefrontbottompartatthesametime.
-Pleasedonotgrabthepanel,butgrabbottomofmasterframewhenyoucarryorinstalltheproducts.
-Pleaseusegloveswhenyoucarryorinstalltheproducts.
Panelprotection
※Attention :
- Do not remove the panel protection pad until a set is completely installed on a stand or a wall hanger.
Please carefully remove Panel protection pad to prevent any damages on the product .
-Pleasemakesuretousepanelprotectionwhenyoumove,carryorrentMPDP.
- 13 -
Panel
Masterframe
MPDP

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Opm-4250r

Table of Contents