Testing Paths 5 And 6 - HP 8517B Operating & Service Manual

S-parameter test set
Table of Contents

Advertisement

NOTE
Troubleshooting the Test Set
Troubleshooting Procedures

Testing Paths 5 and 6

1. Connect a cable between Port 1 and Port 2.
2. To observe the b1 power-level trace through path 5, press:
PARAMETER

then
{USER 4 b1}

{DRIVE}

DRIVE: {PORT 2}

{PHASE LOCK}

{a2}

{REDEFINE DONE}

The b1 path signal is illustrated in Figure 5-12. Typically, each trace
should resemble the examples in Figure 5-12, ( 5 dB).
3. Record your results in Figure 5-6.
4. To observe the b2 power level trace through path 6, press:
PARAMETER

then
{USER 2 b2}

{DRIVE}

DRIVE: {PORT 1}

{PHASELOCK}

{a1}

{REDEFINE DONE}

The b2 path signal is illustrated in Figure 5-12. Typically, each trace
should resemble the examples in Figure 5-12, ( 5 dB).
5. Record your results in Figure 5-6.
Be sure that you return the parameters to their original conditions for a1, b1,
a2, and b2. Use the redefine function to achieve this, or push the instrument
TEST switch to restore factory default conditions.
5-16 HP 8517B S-Parameter Test Set Manual
[MENU]
{REDEFINE PARAMETER}
[MENU]
{REDEFINE PARAMETER}

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents