Figure 2-3. Fibre Bridge Connection, Basic Configuration (Dlt And Mo Libraries) - HP 2100 ER User Manual

Fibre channel scsi bridge 2100 er
Table of Contents

Advertisement

3. Connect one end of the optical cable into the GBIC on the Fibre
4. Connect the power cord from the Fibre Bridge to an grounded outlet.
5. Confirm that all cable ends are connected securely and both ends of
6. Go to "Powering on the System" in Chapter 3.
Figure 2-3
Fibre Bridge Connection, Basic Configuration
(DLT and MO Libraries)
Chapter 2
Bridge and the other end into the GBIC on the Fibre Channel HBA in
the host.
the SCSI bus are properly terminated, as shown in Figure 2-3 on page
2-7.
Setting Up the Fibre Bridge
Installing Cables
2-7

Advertisement

Table of Contents
loading

Table of Contents