7.3.6.1
Installation options for 700 mm wide asymmetrical racks
Rack height Installation direction
vertically
42 HU
ok
24 HU
ok
Table 17: Installation options for 700 mm wide asymmetrical racks
Performing the task
Ê Install the PDU brackets as described on
Figure 67: Single-phase 10-way socket strip mounted in a 700 mm wide asymmetrical rack
Ê Screw each socket strip with 2 screws onto the PDU brackets.
Power Distribution
Installation direction
horizontally
ok
ok