Installing an earthing cable at the top cover
The installation order is as follows:
Figure 85: Earthing cable connectors at the top cover
Ê Install a spring nut (see descripton on
the rack frame where the earthing symbol is located (1).
Ê Screw the "earthing cable configuration" (see
(see also
figure 80 on page
Ê Plug the other end of the earthing cable onto the designated connector on
the top cover (2).
page
32) at the designated point of
116).
Optional accessories
page
115) onto the spring nut