Fujitsu PRIMECENTER M1 User Manual page 91

19-inch rack system for primergy, primequest, bs2000, storage
Table of Contents

Advertisement

Power Distribution
Figure 58: 3-phase socket strip w/ 3x8 sockets mounted 2x in a 700 mm wide symmetrical rack
Ê Screw the socket strip with 2 screws each onto the PDU brackets.
I
Installation is possible on both sides.
91

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents