Preparations

This chapter describes the preparations for installation and all the tasks involved
in setting up and operating the PRIMECENTER M1 19-inch rack.
The service areas
I
Cable outlet dimensions for the raised floor can be found on
page
43.
Figure 2: Service areas for 700 mm racks