Power Outlets - Tripp Lite NetCommander B070-008-19-IP Owner's Manual

Netcommander ip cat5 kvm switch
Hide thumbs Also See for NetCommander B070-008-19-IP:
Table of Contents

Advertisement

2 . Web Configuration Interface

2 .4 .9 Power Outlets

Once a PDU is added to the KVM via the Power Devices section, you need to assign a NetCommander IP Target Server port to one of the
ports on a PDU to be able to Power Cycle it, or turn its power Off/On. For Target Servers with dual power supplies, you can assign multiple
PDU ports to the same KVM port. In this case, power to both of the Target Server ports will be managed at the same time.
To configure the power outlets:
1.
From the Configuration section, select the Power Outlets tab. The Power Outlets page appears.
2.
The Name drop-down list contains all of the PDUs that have been added to the KVM. Select the desired PDU. The Power Outlets page
populates according to the number of outlets on the selected PDU.
3.
For each outlet on the PDU that has a Target Server connected to it, select from the corresponding Server Name dropdown list the
name of the connected server.
4.
Click the Save button at the top of the screen to save your changes.
5.
Repeat these steps for each PDU that has been added to the KVM.
14-03-051 93-32D5.indd 27
27
3/14/2014 9:52:30 AM

Advertisement

Table of Contents
loading

Table of Contents