XSARA
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splash-shield, using tool [1].
Remove the accessories drive belt (see corresponding operation).
Uncouple and plug the diesel fuel delivery and return hoses.
Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gear to permit rotation of the engine.
Remove the upper cover (1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING: Refit the screw (4) equipped with a washer (5 mm thick) .
Rotate the front RH wheel to drive the engine in its normal direction of
rotation.
Bring the camshaft drive and injection pump pinions to their setting
points.
Position the peg [2] (from underneath the vehicle) .
Continue turning the engine until the peg [2] engages in the flywheel.
B1BP30BC
B1BP2FTC
260