Connectivity Cards - Eaton 9SX 8000 Installation And User Manual

Ups
Hide thumbs Also See for 9SX 8000:
Table of Contents

Advertisement

6. Communication
Remote control connection and test
1 - Check the UPS is shut down and the electrical supply network disconnected.
2 - Remove RPO connector from the UPS by unfitting the screws.
3 - Connect a normally closed volt-free contact between the two pins of connector.
1
3
Normally closed
4 - Plug the RPO connector into the back of the UPS and fix the screws.
5 - Connect and restart the UPS according to the previously described procedures.
6 - Activate the external remote shut down contact to test the function.
Always test the RPO function before applying your critical load to avoid accidental load loss.
z Connectivity Cards
Connectivity cards allow the UPS to communicate in a variety of networking environments and with
different types of devices. The 9SX and 9PX models have one available communication bay for the
following

connectivity cards:

Network-MS card
z
browser interface; connects to Ethernet network. In addition, a Environmental Monitoring Probe
can be attached to obtain humidity, temperature, smoke alarm, and security information.
Modbus-MS card
z
z
Relay-MS card
Battery low, UPS alarm/OK, or on Bypass.
See on page 21 for the location of the communication bay.
ETHERNET
Setting/Sensor
100M
10M
UPS data
Reset
Network-MS card
Page 32
Contact open: shut down of UPS
To return to normal operation, deactivate the external remote shut down
contact and restart the UPS from the front panel.
- has SNMP and HTTP capabilities as well as monitoring through a Web
- has connection to Modbus protocol in addition to network management.
- has isolated dry contact (Form-C) relay outputs for UPS status: Utility failure,
ETHERNET
100M
10M
Modbus-MS card
Setting/Sensor
UPS data
Reset
Relay-MS card
8-11kVA EU_EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9sx 110009px 80009px 11000

Table of Contents