Figure 37. Removing and Installing a Server Module
1.
release button
3.
guide rail on server module (or server module
blank)
5.
server module handle
NOTE: The above figure shows removal and installation of a half-height server module. The procedure for
removing and installing a full-height server module is identical to removing and installing a half-height server
module.
Configuring A Server Module
NOTE: Follow this procedure to install PowerEdge M520, M620, or M820 server modules that are not configured for
the VRTX enclosure.
NOTE: If you install PowerEdge M520, M620, or M820 server modules that are not configured for the VRTX
enclosure, an error message is displayed.
To configure a server module for the VRTX enclosure:
1.
Open the server module.
For more information on opening a server module, see the server module Owner's Manual at dell.com/
poweredgemanuals.
2.
Remove any mezzanine cards installed in Fabric B and Fabric C slots of the server module.
2.
PCIe label on server module
NOTE: This label indicates that the
server module is configured specifically
for the VRTX enclosure.
4.
guide rail on enclosure
57