Preparation
4.2
Rack model
Ê Terminate all applications and shut down the server correctly.
Ê If your operating system has not switched off the server, press the on/off
button.
Ê Pull all power connectors out of the power outlets.
4.2.1
Opening the server
Figure 7: Loosening the knurled screws
Ê Loosen the four knurled screws (1) and pull the server as far as possible out
of the rack (2).
U41593-J-Z156-2-76
2
Options Guide
Rack model
1
23