Required Tools; Preliminary Steps - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

System board components
Do not throw batteries into the trash can. Lithium batteries must be
disposed of in accordance with local regulations concerning special
waste.
For further safety information, please refer to section "Environmental
protection" in the PRIMERGY BX924 S3 Operating Manual.
Ensure to insert the CMOS battery with the positive pole facing
up!

10.1.1 Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Replacing the battery: tool-less

10.1.2 Preliminary steps

Before replacing the CMOS battery, perform the following steps:
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired server blade as described in section
defective server blade" on page
Ê Shut down the server blade as described in section
server blade" on page
Ê Remove the server blade from the system unit as described in section
"Removing the server blade from the system unit" on page
Ê Open the server blade as described in section
on page
60.
234
53.
54.
Upgrade and Maintenance Manual
45.
"Opening the server blade"
"Opening the rack
"Locating the
"Shutting down the
59.
BX924 S3

Advertisement

Table of Contents
loading

Table of Contents