The drain outlet is located front and
center of the cases for convenient access and
is especially molded out of ABS material. The
"P" trap, furnished with the case, is construct-
ed of schedule 40 PVC pipe. Care should be
given to assure that all connections are water
tight and sealed with the appropriate PVC or
ABS cement.
The lines can be run left or right of the
tee with the proper pitch to satisfy local
drainage requirements.
31 9/16 in
[80.2 cm]
(STANDARD)
24 3/16 in
42 11/16 in
[61.4 cm]
[108.4 cm]
(NARROW)
(STANDARD)
35 3/8 in
[89.8 cm]
(NARROW)
HOW TO REMOVE KICKPLATE
C L
FRONT OF CASE
60 in [152.4 cm] {2 Door}
90 in [228.6 cm] {3 Door}
120 in [304.8 cm] {4 Door}
150 in [381.0 cm] {5 Door}
180 in [457.2 cm] {6 Door}
96 in [243.8 cm] {8' case}
144 in [365.8 cm] {12' case}
NOTES:
** RECOMMENDED STUB-UP CENTERLINE FOR ELECTRICAL AND HUB DRAINS
MODEL
ORB, ORBH, ONRB & ONRBH
LIFT UP FROM "J"
RAIL AND PULL OUT
KICKPLATE

PLUMBING

The kickplate is shipped loose with the
case for field installation, therefore you
should have open access to the drain line
area.
If the kickplate has been installed, you
will find it very easy to remove. See instruc-
tions below, or the trim out section of this
manual on page 13.
35 1/8 in
[89.2 cm]
(STANDARD)
**
27 9/16 in
[70.0 cm]
(NARROW)
**
1 1/2" PVC DRAIN
CONNECTION
15
33 9/16 in
[85.3 cm]
(STANDARD)
26 7/8 in
[68.3 cm]
39 1/4 in
(NARROW)
[99.7 cm]
(STANDARD)
31 7/8 in
[81.0 cm]
(NARROW)
1 1/2 in
[3.8 cm]