LINE UP
Consult With General Contractor
1
Ask the general contractor if there
have been changes in the building
dimensions since the print you are
using was issued.
Also, ask the
points of reference from which you
should take dimensions to locate the
cases.
Level Floor. Use Laser Transit
4
Leveling is necessary to assure prop-
er case alignment.
Locate highest
point on chalk line as reference for
determining height of shim-pack
levelers.
A laser transit is recom-
mended for precision and requires
just one person.
Snap Chalk Lines
2
Mark floor where cases are to be
located for the entire lineup.
Set Shims On Basehorse Locations
5
Locate basehorse positions along
chalk lines. Spot shim packs at each
basehorse location.
10
BASE RAIL
S n a p
L i n e s
O n
B a s e
Locations
3
Snap lines where base rails are posi-
tioned, not the front or back edges of
the cases.
See case cross section
drawings, pages 4-8, for rail location
dimensions.
Position First Case In Lineup,
Remove Casters, Level
6
Roll first case into position.
case from end under cross support
using
"J" bar. Remove cotter pins
and casters. [CAUTION! Keep hands
from under case]
Level case on
shims.
BASE RAIL