Now that cases have been positioned and leveled, you may
proceed to trim-out case lineup. Trim parts have been
designed to be applied easily with only a small number of
fasteners required. Most external parts are adjustable to
achieve almost invisible, snug-fitting joints and a high level
of excellence in fit and finish.
Snap Chalk Lines
2
Mark floor where cases are to be
located for the entire lineup.
Set Shims On Basehorse Locations
5
Locate basehorse positions along chalk
lines.
Spot shim packs at each
basehorse location.
BASE RAIL
BASE RAIL
S n a p
L i n e s
O n
B a s e
Locations
3
Snap lines where base rails are posi-
tioned, not the front or back edges of
the cases.
See case cross section
drawing, page 3, for rail location dimen-
sions.
Position
First
Case
Remove Casters, Level
6
Roll first case into position. Raise case
from end under cross support
"J" bar. Remove cotter pins, casters,
and outriggers. [CAUTION! Keep hands
from under case] Level case on shims.
6
Consult With General Contractor
Ask the general contractor if there have
been changes in the building dimen-
sions since the print you are using was
issued. Also, ask the points of reference
from which you should take dimensions
to locate the cases.
R a i l
Level Floor. Use Laser Transit
Leveling is necessary to assure proper
case alignment. Locate highest point on
chalk
determining
levelers. A laser transit is recommend-
ed for precision.
In
Lineup,
Position Next Case In Line Up
Roll case approximately 6' from adjoin-
using
ing case. Remove casters on the end
nearest to the next case. Allow casters
to remain on opposite end to assist in
pushing cases together - then remove
them.
1
4
line
as
reference
height
of
shim-pack
7
for

Advertisement

Table of Contents
loading

Table of Contents