Table of Contents
Installation Requirements
Location ................................................ 7
Clearances ...........................................8
Alcove ....................................................8
Gas Pressure ............................................ 18
Operation .................................................22
Maintenance ...........................................22
Jøtul GF 100
DV II Nordic QT
and
Jøtul GF 200 DV II Lillehammer
Direct Vent Gas Heaters
Manufactured and Distributed by:
Jøtul North America
Gorham, Maine
U.S.A.
N.Y.C. Dept. of Buildings
MEA No. 369-04-E
Test Standards
This appliance complies with U.S. and Canadian
National Safety standards and is tested and
listed by Intertek Testing Services of Middleton,
Wisconsin to:
ANSI Z21.88-2005,
ANSI Z21.88a / CSA 2.33a - 2007,
CAN/CGA 2.17-M91,
and CSA P.4.-01.2
DO NOT ATTEMPT TO ALTER OR MODIFY
THE CONSTRUCTION OF THE APPLIANCE
OR ITS COMPONENTS. ANY MODIFICATION
OR ALTERATION WILL VOID THE WARRANTY,
CERTIFICATION AND LISTING OF THIS APPLIANCE.
Suggested Tools for
Installation and Service
• External regulator (for Propane only)
• Piping which complies with local code
• Manual shut-off valve (T-Handle in Massachusetts)
• Sediment trap - if required by code
• Tee joint
• Pipe wrench
• Pipe sealant
• 10 mm open end wrench
• 1/2", 7/16" open end wrench or deep socket
• Phillips head screwdriver
• Flat head screwdriver
• 1/4" nut driver
• 4 mm allen wrench
• Gloves
• Safety glasses
• Torx T20 screwdriver
• Leak test solution
• Reciprocating Saw
• Power Drill
138003_Rev_K / 7.29.10
3