Step 2, Mounttemplate; Step 3, Size And Installductwork - Monogram ZV42I Installation Instructions Manual

Island vent hoods
Table of Contents

Advertisement

Installation
Instructions
_TEP 21 MOUNT
TEMPLATE
• Select the template for your hood size.
• Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctly,
with the front of the hood.
• Use a plumb to check to be sure the mounting
holes will provide parallel alignment with the
countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a
3/16" bit and drill approximately 1-I/2" deep.
• Drive 4 Hex head wood screws (Screws A) into
the center of the ceiling joists and cross framing.
Leave a 1/4" gap to allow the screw head to
engage the keyhole slots on the support frames.
• Cut the 10-1/2" duct opening through the sheet
rock.
0
Screws A
ISTEP 3] SIZE AND INSTALL DUCTWORK
• Measure from house duct flange to bottom of
support frame. Subtract 4-3/8" for clearance to the
bottom of the support frame.
• Cat the 10" duct length to size.
• Secure duct to house ducting with sheet metal screws.
• Seal all connections with duct tape.
• Attach the duct collar loosely, about 1" from the bottom
of the duct using Screws B.
House
Duct
Duct
Collar.
Screws B
Duct
Length
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv54iZv54i

Table of Contents