RED COMPACT 35 Installation And User Manual page 51

Pellet boiler
Hide thumbs Also See for COMPACT 35:
Table of Contents

Advertisement

10-MAINTENANCE AND CLEANING
ATTENTION: It is advisable to carry out the cleaning of the upper exchanger at the end of the season by an authorised
technician in order to also replace the gasket located below plug "B".
CLEANING THE LOWER COMPARTMENT
Lower lever "E" and extract pan "F", take out pans "H". Remove the ash from all pans and if needed use a vacuum cleaner to remove any
other ash or soot that has built-up under the drawer. Remove brazier "G" and clean it every 2/3 days. Check the seal of the ceramic fibre
gasket on the plug and replace it if necessary.
Check the seal of the door gasket and replace it if necessary.
At the end of the season one must clean the compartment under the brazier and the inside of the heat exchanger.
This general cleaning should be carried out at the end of the season in order to facilitate the general removal of all combustion residues,
without waiting too long, because with time and humidity these residues can become compacted.
CLEANING THE SMOKE FAN COMPARTMENT
Remove the four screws "S" that keep the plug "T" fastened on the rear part of the boiler and remove any ash deposited on the smoke fan
with a vacuum cleaner.
Check the seal of the ceramic fibre gasket "U" on the plug and replace it if necessary.
CLEANING THE SMOKE DUCT AND GENERAL CHECKS:
Clean the smoke exhaust, especially around the T-fittings, curves and any horizontal sections. For information on cleaning
the flue, contact a chimney sweeper.
Check the tightness of the ceramic fibre gaskets on the boiler door. If necessary, order new replacement gaskets from the retailer or contact
an authorized service centre to carry out this task.
ATTENTION:
The frequency with which the smoke exhaust must be cleaned depends on the use of the boiler and the type of
installation.
We recommend contacting an authorised service centre for end-of-season maintenance and cleaning as the above-
mentioned operations will be performed together with a general inspection of the components.
Technical Dept. - All rights reserved - Reproduction is prohibited
S
T
U
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents