Installation; Chapter 2 Installation; Installation Environment - GE Security TruVision DVR 10 User Manual

Network digital video recorder
Table of Contents

Advertisement

Chapter 2

Installation

Installation environment

When installing your product, consider these factors:
• Ventilation
• Temperature
• Moisture
• Chassis load
Ventilation: Do not block any ventilation openings. Install in accordance with the
manufacturer's instructions. Ensure that the location planned for the installation of
the unit is well ventilated.
Temperature: Consider the TVR 10's operating temperature (14 to 122°F, −10 to 50°C)
and noncondensing humidity specifications (10 to 90%) before choosing an
installation location. Extremes of heat or cold beyond the specified operating
temperature limits may reduce the life expectancy of the TVR 10. Do not install the
TVR 10 on top of other hot equipment. Leave 1.75 in. (44 mm) of space between rack
mounted TVR 10 units.
Moisture: Do not use the unit near water. Moisture can damage the internal
components. To reduce the risk of fire or electric shock, do not expose this unit to rain
or moisture.
Chassis: Equipment weighing less than 35 lb. (15.9 kg) may be placed on top of the
TVR 10.
TruVision DVR 10 User Manual
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tvr-1004-250Tvr-1004-500Tvr-1004-1t

Table of Contents