Start Up Checklists; Nhtc/Pc Pre-Start Up Checklist - Nortec NHTC Installation And Operation Manual

Nh series electric steam humidifier
Hide thumbs Also See for NHTC:
Table of Contents

Advertisement

NHTC/PC Pre-Start Up Checklist

Unit Serial #: _________________ Tag: _______________
Unit type: _______ __________
Cylinder type:
Water Quality:
 Well water  City water  Softened water 
Humidifier Mounting: (Clearances around the unit Acceptable Obstruction)
 Level  Front/Side Clearance 
Steam Line(s):
 Slope up (min 2 in/ft). 
 Diameter / Size
 Low point condensate traps 
 Type of Insulation
Condensate Line(s):
 P Trap min 6 in or duct press + 2in 
Water Line:
 1/2 in to within 4ft of unit 
Drain Line:
 Air gap within 3 ft of the unit 
Cylinder:
 Seated in drain valve and secured
Wiring:
 Wiring connections and connectors secured
Controls:
 Control Location
 High Limit Location
Power:
 Voltage, amp, fuse per Spec Label:
 Disconnect switch located close to humidifier
 Panel Number
Inspected by:
Company:
39 | Start Up
Voltage: ________V/_____ph Steam output: ______lb/hr
Customer/Job:
Slope down (min 0.500 in/ft) 
Material
No Hose Kinks / Restrictions 
P Trap min 12 in drop 
Water pressure: 30-80 psig 
Diameter / Size
yes 
yes 
Control to Terminal 4 
High Limit to terminal 5 
yes 
yes 
Date of inspection: ______/_______/______
Address:
no 
no 
no 
no 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nhpc

Table of Contents