Start Up Checklists - Nortec SE Series Installation And Operation Manual

Includes installation, operation, maintenance, and troubleshooting information for your indoor nortec setc b+ and nortec sep steam exchange humidifier
Hide thumbs Also See for SE Series:
Table of Contents

Advertisement

Nortec SETC/P Pre-Start Up Checklist
Unit Serial #:
Unit type:
Customer/Job:
Water Quality:
 Potable (0-12 grains/gal, 0-14 ppm Silica, 0-25 ppm Chlorides)  RO  DI 
Humidifier Mounting: (Clearances around the unit Acceptable Obstruction)
Level  Front/Side Clearance 
Steam Line(s):
 Slope up (min 2 in/ft). 
 Diameter / Size
 Low point condensate traps 
 Insulated 
Condensate Line(s):
P Trap min 8 in. (20 cm) plus duct static pressure P Trap min 12 in drop 
Water Line:
 Can provide required flow 
Drain Line:
 Air gap within 3 ft of the unit 
 Auxiliary drain connected with shut off valve 
Boiler Steam
 Boiler Pressure
 15 psi relief valve if med/high press boiler 
 Actuator closes and opens CV valve fully 
 Condensate return Gravity feed or pump 
Wiring:
 Wiring connections and connectors secured
Controls:
 Control Location
 High Limit Location
Power:
 Voltage, amp, fuse per Spec Label:
 Disconnect switch located close to humidifier
Inspected by:
Company:
41 | Start Up
Tag:
Voltage:
V/
Address:
Anchored (if on stand) 
psi
yes 
Date of inspection:
ph Steam output:
Slope down (min 0.500 in/ft) 
Material
No Hose Kinks / Restrictions 
Type of Insulation
Water pressure: 30-80 psig 
Diameter / Size
Pressure to humidifier
Design pressure at CV valve 
no 
Control to Terminal 4 
High Limit to terminal 5 
yes 
no 
yes 
no 
/
lb/hr
psi
/

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents