Unloading the Cabinet(s)
Powerware
9155 UPS (8–15 kVA) User's Guide
®
The following tools are required for unloading the cabinet(s):
15 mm wrench or socket
7 mm nutdriver or socket
The UPS and EBM are heavy (see page 10). Unloading the cabinets requires at
least two people to safely remove the cabinets from the pallet.
To remove the UPS or EBM from the shipping pallet:
1. Remove the two M10 bolts securing the stabilizing bracket to
the pallet (see Figure 2).
Figure 2. Removing the Stabilizing Bracket Bolts
164201553 Rev D www.powerware.com
S
C A U T I O N
UPS Setup
M10 bolts
11