Installation

Cabinet Setup

You can position the UPS cabinets horizontally or vertically. When
positioning the cabinets horizontally, the EBMs must be placed below
the UPS (see Figure 3).
2
NOTE The EBMs must be installed below the UPS as shown in Figure 2.
5. Slide the UPS and any optional EBMs into the rack. Continue to
"Installing the UPS" on page 4 to complete the installation.
UPS
Optional
EBMs
UPS
Optional
EBMs
Figure 3. Horizontal Cabinet Setup
Powerware
9125 Installation Guide for IBM Applications
®
Figure 2. Rack-Mount UPS with EBMs