2.
Secure the rail bracket to the rack with the screws provided.
3.
Align the cable management tray with the end of the rail brackets.
4.
Slide the tray into the brackets until it reaches the back of the rack.
TIP:
If you have any difficulty sliding the cable management tray into the rail brackets, loosen
the screws that hold the rail bracket to the rack while sliding the tray in. Tighten the screws
when the tray is in place.
5.
Use the screws provided to secure the cable management tray to the rack.

Component installation

The following sections contain installation instructions for the individual enclosure components. All
components must be installed and cabled before you power up the enclosure. There is no specific
installation order requirement for the enclosure components.
Refer to the following table for component, location, and U positions when installing components
into a rack.
Component
First (upper) breaker panel (2U total)
1U of ventilation space required for
lower breaker panel
Second (lower) breaker panel (2U
total)
Second (upper) cable management
tray (2U total)
Second (upper) seismic brace (1U
total)
Second (upper) enclosure (10U total)
First (lower) cable management tray
Location
Upper portion of the rack
Between the upper and lower breaker
panels
Under the first breaker panel
Above the second seismic brace
Above the second enclosure
Above the bottom cable management
tray of the first installed configuration
Above the seismic brace
U position
U35-U36
U34
U32-U33
U25-U26
U24
U14-U23
U12-U13
Component installation