5.
For the seismic rack only: Place the anchor rod assembly and washer kit into the anchor holes.
See
Figure 1 (page 27)
For the seismic rack R2 only: Place the concrete anchor bolt with washer kit into the anchor
holes. Use the same washer stackup shown in
Figure 1 Concrete Anchor Rod Assembly
12 mm bolt head
1
Threaded concrete anchor rod
2
Large plate washer
3
Metal drip plate (included in rack
4
accessory kit)
Metal sleeve
5
Plastic sleeve
6
Expansion sleeve
7
6.
Using a hammer, tap the bolts into the holes. Stop when the bolts are firmly seated in the floor.
7.
For the seismic rack: Use a 19 mm socket to torque the anchor bolt to 58 ft-lbs (77 N-m). If
the anchor bolt has a red cap, the red cap will break off when torqued to the correct amount.
For the seismic rack R2: Using a 24-mm socket, torque the anchor bolt to 58 ft-lbs (77 N-m).
The anchor bolt's red cap will break off when torqued to the correct amount.
8.
Reconnect the ground wire to the kickplate and install the kickplate at the bottom of the rack.
for proper stackup.
Figure 1 (page
27).
Threaded cone
8
Concrete floor
9
Rack leveling foot
10
Rack base
1 1
Nylon insulator bushing
12
Spring washer
13
Unpacking and moving the Seismic Rack
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents