Component Installation; Installing A Power Supply - HP Xw460c - ProLiant - Blade Workstation Setup And Installation Manual

Hp bladesystem c7000 enclosure setup and installation guide
Hide thumbs Also See for Xw460c - ProLiant - Blade Workstation:
Table of Contents

Advertisement

Close the hinges, and tighten the thumbscrews to secure the rear cage.
4.

Component installation

The following sections contain installation instructions for the individual enclosure components. All
components must be installed and cabled before you power up the enclosure. There is no specific
installation order requirement for the enclosure components.

Installing a power supply

See "Running the Insight Display installation steps (on page 64)" for information on the types of power
configurations available and how to set them up.
If your HP BladeSystem c7000 Enclosure is equipped with a three-phase power configuration, six power
supplies are required. Single-phase configurations can have fewer than six power supplies.
Install the power supplies based on the total number of supplies needed:
Two power supplies: Bays 1 and 4
Three power supplies: Bays 1, 2, and 4
Four power supplies: Bays 1, 2, 4, and 5
Five power supplies: Bays 1, 2, 3, 4, and 5
Six power supplies: All bays
Install power supply blanks in any unused power supply bays.
Power supplies are installed in this manner to provide maximum flexibility for redundancy in three-phase
configuration options.
NOTE:
configuring DC power supplies or HP Carrier Grade Solutions, see the documentation that
came with your power supply.
This document discusses installation of AC power supplies only. For information on
Installation 30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladesystem c7000

Table of Contents