Dc Power Supply; Hp Seismic Rack Mounting Kit For The Msa2324 Cg - HP BladeSystem c7000 Setup And Installation Manual

Bladesystem c7000 carrier-grade enclosure
Hide thumbs Also See for BladeSystem c7000:
Table of Contents

Advertisement

2.
Slide the DC input module into the rack.
3.
Tighten the thumbscrews.
4.
Replace the DC input module cover.

DC Power Supply

CAUTION:
all bays are populated with either a power supply or a power supply blank.
CAUTION:
the same enclosure.
Install the power supplies based on the total number of supplies needed:
Two power supplies: Bays 1 and 4
Three power supplies: Bays 1, 2, and 4
Four power supplies: Bays 1, 2, 4, and 5
Five power supplies: Bays 1, 2, 3, 4, and 5
Six power supplies: All bays
Install power supply blanks in any unused power supply bays.
To install a power supply:
1.
Slide the HP BladeSystem Insight Display to the right or left to gain access to all power supply
bays.
2.
Open the power supply bracket.
3.
Insert the power supply into the enclosure, and close the bracket.
Look the power supply LEDs
supply.
To calculate how many power supplies are needed, see the HP BladeSystem Power Sizer:
www.hp.com/go/bladesystem/powercalculator.

HP Seismic Rack Mounting Kit for the MSA2324 CG

The HP Seismic Rack Mounting Kit for the MSA2324 CG supports installation of the HP
StorageWorks MSA2324 Carrier-Grade Storage Array in the HP Seismic Rack.
38
Installation
To prevent improper cooling and thermal damage, do not operate the server unless
To prevent damage to sever components, do not mix AC and DC power supplies in
("Power Supply LEDs" (page
10)) to determine the status of the power