Step 10 Connect Water Supply; Step 11 Connect Power; Step 12, Start Icemaker - GE ZICS360 LH Installation Instructions Manual

Built-in bottom-freezer refrigerators
Table of Contents

Advertisement

STEP 10 CONNECT WATER SUPPLY

House
Water Supply
• Locate and bring tubing to the front of the cabinet.
• Turn the water on to flush debris from line. Run
about a quart of water through tubing into a bucket,
then shut off water.
Copper Tubing:
• Slip a 1/4" nut and ferrule (provided) over both
ends of the copper tubing. Insert tube into the
union fitting on the unit and tighten nut to union.
• Turn on the water to check for leaks.
GE SmartConnect
Tubing:
• Insert the molded end of the tubing into the
refrigerator connection. Tighten the compression
nut until it is just hand tight.
• Tighten one additional turn with a wrench.
Overtightening can cause leaks!
• Turn on the water to check for leaks.
Note: Make sure excess tubing length does not
interfere with drawer closing or toekick installation.
Installation Instructions
Refrigerator
Water Supply

STEP 11 CONNECT POWER

• Check to be sure the power cord is plugged into
the receptacle.
Electrical
Outlet
• Check to make sure power to refrigerator is on by
opening refrigerator door to see if interior lights
are on.
• The temperature controls are preset at 37°F
for the fresh food section and 0°F for the freezer.
• Allow 24 hours to stabilize before making
adjustments.
STEP 12 START ICEMAKER
• Flip the switch to I (ON). The icemaker will begin
operation automatically.
• Be sure nothing interferes with the sweep of the
feeler arm.
• Discard the first full bucket of ice cubes.
• To turn the icemaker off, set the switch to O (OFF).
16
Raise
Grille
Panel
Master Light
Switch
Power Switch
Feeler Arm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zic360n lhMonogram zics360n lh

Table of Contents