Installing The Cable Management Brackets - HP Cluster Platform Hardware Kits v2010 Installation Manual

Cisco sfs 7012d infiniband interconnect cable management brackets installation guide
Hide thumbs Also See for Cluster Platform Hardware Kits v2010:
Table of Contents

Advertisement

2 Installing the Cable Management Brackets

Use the following procedure to install the Cisco SFS 7012D InfiniBand Interconnect Cable
Management Brackets.
The location of the bracket depends on the rack position occupied by the Cisco SFS 7012D
InfiniBand Interconnect. The Cisco SFS 7012D InfiniBand Interconnect used in an HP Cluster
Platform solutions are installed in the lower "U" locations of an HP 10K G2 Series Rack.
1.
Determine the cable management bracket installation locations by aligning the cable
management bracket's cable channels with the rows of ports on the rear of the Cisco SFS
7012D InfiniBand Interconnect. Each of the cable management bracket's channels must line
up with the six rows of ports on the back of the Cisco SFS 7012D Series InfiniBand
Interconnect. The cable management brackets (callout 3 in
interconnect's rackmount bracket's rear mounting flanges (see callout 5 in
2.
Fasten the cable management brackets to the rear rack rails using two M6 screws and two
cage nuts for each cable management bracket, as shown in
3.
Tighten the fasteners to the recommended torque as shown in
Figure 2-1 Installing the Cable Management Brackets
4
The following list corresponds to the callouts shown in
1.
Cisco SFS 7012D Series InfiniBand Interconnect (144 ports)
2.
Right rear rack rail
3.
Cable management brackets
4.
Left rear rack rail
1
3
5
6
Figure
Figure
2-1) mount above the
Figure
Figure
2-1.
Table 1-1 (page
10).
2
7
2-1.
2-1).