•
Tools:
— Screwdriver, #2 (medium) Phillips.
— Cage-nut insertion tool (shipped with the rack) or a flat-headed screwdriver.
— Marker pen or masking tape.
•
Resources: Cables of the type used by the HP BladeSystem c-Class InfiniBand switch.
1.6 Prerequisites
Before you begin to mount the bracket:
•
Follow the usual cable-handling precautions for InfiniBand cables, see the HP Cluster Platform
InfiniBand Interconnect Installation and User's Guide.
•
Ensure you know how to plug in the InfiniBand cables, as described in the HP Cluster Platform
InfiniBand Interconnect Installation and User's Guide.
•
Read the rack installation instructions for the c-Class enclosure.
•
Obtain the set of cabling tables required for your HP Cluster Platform solution.
Important:
Do not secure the enclosure into the rack before you begin the bracket installation. You must be
able to access the rear (inward) face of the rack columns.
1.6 Prerequisites
9
Need help?
Do you have a question about the Cluster Platform Hardware Kits v2010 and is the answer not in the manual?