Figure 3-3 InfiniBand Cable Secured with a Releasable Cable Tie
1
2
Caution:
The releasable cable tie should only be hand tight. Do not use a cable tie installation tool
and do not over tighten the releasable cable tie or it might damage the InfiniBand cable.
5.
Leaving approximately 1/4 inch to 3/8 inch coming out of the buckle, clip the excess from
the releasable cable tie. Use one of the clipped-off pieces of cable tie as a tightness gauge
(see callout 1 in
4 in
Figure
secured to the cable management bracket (callout 2 in
(not shown in
Figure 3-4 Gauging the Tightness of the Releasable Cable Tie Loop
3
2
6.
Repeat steps 4 and 5 to secure the remaining InfiniBand cables.
7.
Route the InfiniBand cables to the side of the rack and secure them either upward or
downward in the cable management plate. Be sure not to exceed the four inch minimum
bend radius for each InfiniBand cable as you route them in the rack.
16
Installing the Cable Management Bracket
Figure
3-4) to check that there is room to allow the InfiniBand cable (callout
3-4) to move freely in the releasable cable tie loop (callout 3 in
Figure
3-4).
1
Figure
Figure
3-4) with a push button mount
4
3-4) that is

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cluster Platform Hardware Kits v2010 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Bladesystem c-class enclosure cable management bracket

Table of Contents