A Cable Management Bracket Holding 8 Infiniband Uplink Cables - HP Cluster Platform Hardware Kits v2010 Installation Manual

Hp bladesystem c-class enclosure cable management bracket installation guide (436670-doc)
Hide thumbs Also See for Cluster Platform Hardware Kits v2010:
Table of Contents

Advertisement

Figure 3-2 A Cable Management Bracket Holding 8 InfiniBand Uplink Cables
The following list describes the callouts shown in
1.
Left rear rack column
2.
8 secured InfiniBand cables
3.
One of the 8 releasable cable ties (completed assembly)
Important:
You must install the HP BladeSystem c-Class enclosure cable management bracket to provide
proper strain relief for the InfiniBand cables.
To install the InfiniBand cables and secure them with the releasable cable ties, follow these steps:
1.
Depending on the type of c-Class InfiniBand switch you have (see
determine the appropriate holes to install the push-button mounts. The row of holes closest
to the InfiniBand switch are used for the 16 uplink port InfiniBand switch. The row of holes
furthest out from the switch are used for the 8 uplink port InfiniBand switch.
2.
Install the push-button mounts by pressing them upward into each hole in the cable
management bracket for your InfiniBand switch type (see callout 4 in
3.
Cable the lower InfiniBand switch first, as described in the HP BLc 4X DDR InfiniBand Gen
2 Switch Installation Guide.
4.
To secure an InfiniBand cable (callout 1 in
slide the releasable cable tie through the push button mount and around the InfiniBand
cable (see callout 2 in
1
3
Figure
Figure
3-3) and through the releasable cable tie lock.
3.2 Installing the Releasable Cable Ties for the InfiniBand Cables
2
Figure
3-2:
Figure 3-1
3-3) to the cable management bracket,
and
Figure
3-2),
Figure
1-1).
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladesystem c-class enclosure cable management bracket

Table of Contents