COMMISSIONING PROCEDURE GREENSTORE
Customer/responsible for installation:
Installer of installation:
Heat pump type:
Commissioning date:
Type of collector:
Other components in the installation:
Additional heat
Water heater
3-way valve
Miscellaneous:
The following work has been carried out:
Heating system: filled vented particle filter cleaned minimum flow ensured installation of T1 checked Heat curve set
Collector system: filled vented particle filter cleaned vents installed collector fluid concentration checked
Electrical connection: performed motor cut-out settings checked
Sight glass: checked notes:
Operating temperatures after 10 minutes heating/hot water operation:
Heat transfer fluid out (T8):.................. °C
Temperature difference between Heat transfer fluid out (T8) and in (T9) approx. 6 ... 10 K ( °C)
Collector circuit in (T10): .................. °C
Temperature difference between Collector circuit in (T10) and Collector circuit out (T11) approx. 2 ... 5 K ( °C)
Setting heat carrier pump (G2):
Leak test for heating system and collector system carried out
Function check carried out
Customer/responsible for installation: has been informed of how to operate the heat pump
Documentation handed over
Date and signature of installation installer:
Table 182
6 720 806 768 (2013/02)
COMMISSIONING PROCEDURE GREENSTORE
Serial number:
Date of manufacture:
Total length of collector:
Room controller T5
Exhaust air collector
Hot water sensor T3
Flow line sensor heating circuit 2 E12.T1
Heat transfer fluid in (T9):................ °C
Collector circuit out (T11): .................. °C
Setting collector circuit pump (G3):