SETTINGS

20.4 ENERGY MEASUREMENTS

Energy is measured per compressor; the calculated
results are added prior to being displayed.
> Generated energy
This displays Generated energy in kWh divided into Heating and Hot
water.
> Consumption electric additional heat
This displays Consumption electric additional heat in kWh divided into
Heating and Hot water.

20.5 TIMERS

The control unit shows the timers that are in operation. There are a
number of timers for, e.g., delays of different types, but also for extra hot
water, hot water peak, etc. A number of these times are set under
Timers
Extra hot water
Hot water peak time for warm-keeping
Alarm mode delay
Party
Operating time for heating at hot water demand
Hot water, operating time at heating demand
Heat pump x timers
> Compressor start delay
> Compressor start delay groundwater
> G2 heat carrier pump stop delay
> Block low pressure switch
> Compressor working area timers
>> Block after hot water production
>> Delay after temporary stop
>> Block after low outdoor temperature
Additional heat timers
> Additional heat start delay
> Additional heat start delay after high outdoor temperature
> Delay mixing valve control after additional heat start
> Additional heat program activation delay after low outdoor
temperature
Delay before change over to summer operation
Delay before change over to winter operation
Shut down protection during change over from hot water to heating
*)
Heating start delay
*)
Heating stop delay
Table 99 Timers
*)
Between compressors/heat pumps
50
customer or installer, whereas others have a set factory value which
cannot be changed. Level shows at what level the setting can be made.
0 = Customer, 1 = Installer, 3 = Factory.
Setting
Extra hot water duration
Hot water\Hot water peak\Time for warm-keeping
Party (
)
Room temperature\General\Maximum operating time for heating
at hot water demand
Hot water\Maximum operating time for hot water at heating
demand
Installer\General\Groundwater\Compressor start delay
Additional heat\Additional heat general\Start delay
Additional heat\Mixed additional heat\Delay mixing valve control
after additional heat start
Room temperature\General\Summer/winter operation\Delay
before change over to summer operation
Room temperature\General\Summer/winter operation\Delay
before change over to winter operation
F value
Level
0h
0, 1
1.0h
1
1.0h
3
0h
0
20min
0
30 min
0
10min
3
0s
1
5min
3
150s
3
120s
3
60min
3
30 min
3
120min
1
30 min
3
20min
1
15min
3
4h
1
4h
1
300s
3
3min
-
3min
-
6 720 806 768 (2013/02)

Advertisement

Table of Contents
loading

This manual is also suitable for:

7 kw9 kw11 kw7 kw9 kw11 kw

Table of Contents