Preparation Before Operation; Releasing The Locking Pin; Installation - Hitachi C 10FSH Handling Instructions Manual

Slide compound miter saw
Table of Contents

Advertisement

PREPARATION BEFORE OPERATION

Make the following preparations before operating the power tool:

1. Installation

150mm
(5-29/32")
9mm
(11/32")
3 Holes
300mm (11-13/16")
Attach the power tool to a level, horizontal work bench in accordance with Fig. 4.
Select 8mm (5/16") diameter bolts suitable in length for the thickness of the work bench.
Bolt length should be at least 40mm (1-9/16") plus the thickness of the work bench.
For example, use 65mm (2-9/16" ) or larger bolts for a 25mm (1") thick work bench.
The holder attached to the rear of the base helps stabilize the power tool.
6mm Bolt
Holder
Adjust the holder until
its bottom surface
contacts the work bench
surface.
Fig. 5

2. Releasing the locking pin

Handle
Locking Pin
Fig. 6
8
Move
Pull
Base
Work Bench
Fig. 4
Holder adjustment:
Loosen the 6mm bolt with the supplied 10mm box
wrench.
Adjust the holder until its bottom surface contacts
the work bench surface.
After adjustment, firmly tighten the 6mm bolt.
When the power tool is prepared for shipping, its
main parts are secured by a locking pin.
Move the handle slightly so that the locking pin
can be disengaged.
NOTE:
Lowering the handle slightly will enable
you to disengage the locking pin more
easily and safely.
The lock position of the locking pin is for
carrying and storage only.
8mm (5/16") Bolt
8mm (5/16") Nut

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents