Installation - Kohler OVE Installation & User Manual

Dual-flush toilet
Hide thumbs Also See for OVE:
Table of Contents

Advertisement

Installation

1 
Remove the existing toilet: Turn off the water supply and flush the toilet, then
sponge out all remaining water from the cistern. Disconnect the supply shut-off
valve (if present), and remove the old pan and cistern.
CAUTION: Risk of hazardous gases. If the new toilet is not installed immediately,
temporarity stuff a rag in the closet flange.
2 
Define the position of connector: Place the connector onto the pan, position
between outlet and waste pipe.
Case 1
Pan
Waste Pipe
Connector
Case 3
Pan
3 
Position the template on the floor. Mark the positions of the floor fixing kit holes.
Waste Pipe
A
Connector to Wall
Kohler Co.
Finished
Wall
X
Finished
Wall
Waste Pipe
Connector
Offset Pan Collar
Connector
X
X = Set out as per spec sheet
Case 2
Pan
B
Connector to Wall
3
Finished
Wall
Waste Pipe
Connector
Connector
X
Waste Pipe
1102602-A2-D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

PanacheOpiazParliamentPersuadeEscale

Table of Contents