Page 2
Tools and Materials Thank You For Choosing Kohler Company We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don’t hesitate to contact us. Our phone numbers are listed on the back cover. Thanks again for choosing Kohler Company.
Page 3
Offset Pan Collar Connector X = Set out as per spec sheet 3 Position the template on the floor. Mark the positions of the floor fixing kit holes. Waste Pipe Waste Pipe Connector to Wall Connector to Wall 1102602-A2-D Kohler Co.
Page 4
Drill 5/16” (8 mm) mounting holes at the marked locations. Insert anchors into the holes. Place the toilet and align with anchoring holes position. Tighten screws and attach the bolt caps. Fixing Holes Screw Cap Screw Anchor Drill Sleeve Kohler Co. 1102602-A2-D...
Page 5
Installation 6 In cistern. PANACHE Tank Hose Stop Valve OPIAZ PARLIAMENT Optional Bottom Water Inlet Kit PERSUADE 148794A-NA for use on ESCALE OPIAZ PARLIAMENT PERSUADE ESCALE 1102602-A2-D Kohler Co.
Page 6
Plan Washer Fiber Washer Sealing Washer Screw 8 Connect the supply shut-off valve to the supply hose and connect supply hose to toilet supply shank. Water Supply Hose Water Supply Hose (Not supplied) Bottom Inlet Type Rear Inlet Type Kohler Co. 1102602-A2-D...
Page 7
Mark this lengh and cut the push rod to length. Cut the push rod to length. 3 4 Reassemble the push rods. Fit the lid and test the buttons. Adjust the rods as required. 1102602-A2-D Kohler Co.
Page 8
1 Assembly flush valve by pressing it Release flush valve by squeezing the tabs on both side of the canister into the flush valve so it snaps into place. and pulling straight up out of the flush valve. Kohler Co. 1102602-A2-D...