NEC NEAX Express Service & Reference Manual page 95

Hide thumbs Also See for NEAX Express:
Table of Contents

Advertisement

8. Remove the new processor from its antistatic package and place it on a
grounded, static-free surface or conductive foam pad.
9. Position the processor back into the URM. Ensure that the alignment notch
in the SEC cartridge fits over the plug in Slot 1. Push down firmly, with
even pressure on both sides of the top, until the SEC cartridge is seated.
10. To lock in the processor, push the latches inward until they secure the SEC
cartridge into place in the URM, Item A in Figure "Removing a Processor"
above. The latches must be secured for proper electrical connection of the
processor.
11. After you have installed a new processor, you must run the BIOS Setup
Utility (F2) to configure its speed. Refer to Chapter 3, "Configuring Your
System."
12. Replace the left side panel, plug in the system power cords, and power up
the system.
Disassembly and Reassembly 4-13

Advertisement

Table of Contents
loading

Table of Contents