Component Testing; Heater - Maytag MED / GD 9700S Technical Education

Front-loading gas and electric dryers
Table of Contents

Advertisement

Before testing any of the components, perform
the following checks:
• Control failure can be the result of corro-
sion on connectors. Therefore, disconnect-
ing and reconnecting wires will be neces-
sary throughout test procedures.
• All tests/checks should be made with a
VOM or DVM having a sensitivity of 20,000
ohms-per-volt DC, or greater.
For any additional test beyond what is covered
in this Component Testing section, refer to the
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.

HEATER

Refer to page 4-10 for the procedure for ser-
vicing the heater.
1. Unplug dryer or disconnect power.
2. Disconnect one of the wire connectors from
the heater terminal block.
3. Set the ohmmeter to the R X 1 scale.
4. Touch the ohmmeter test leads to the ter-
minals on the heater terminal block. The
meter should indicate between 7 and 12 Ω.

COMPONENT TESTING

WARNING
Electrical Shock Hazard
• Check all connections before replacing com-
ponents, looking for broken or loose wires,
failed terminals, or wires not pressed into
connectors far enough.
• Resistance checks must be made with
power cord unplugged from outlet, and with
wiring harness or connectors disconnected.
Tech Sheet that is supplied with the product.
5-1
Heater Terminal Block