17. Secure the
compression lugs on the battery cabinet backplane as shown in
Figure 46. Torque all three compression lugs to 8.5–9.6 Nm
(75–85 lb in).
18. If an additional battery cabinet will be connected to the first, in a
daisy-chain configuration, use another external battery cabinet cable
assembly for the connections between the battery cabinets (see
Figure 47).
19. Locate the daisy-chained cable on the rear of the first battery
cabinet in the section below the location of the first cable assembly.
Follow this procedure for connecting any additional daisy-chained
battery cabinets.
+
Eaton 9170
UPS (3–18 kVA) User's Guide
+
Figure 46. Battery Cable Installed in Battery Cabinet
+
, the
, and the
S
164201393 Rev E www.eaton.com/powerquality
BATTERY CABINET INSTALLATION
conductors to the proper
65