Dell Active Fabric Manager Deployment Manual page 51

Active fabric manager deployment guide 1.5
Hide thumbs Also See for Active Fabric Manager:
Table of Contents

Advertisement

Complete
Incomplete. The
system MAC and
IP address are
not configured for
the switches.
Complete
Partial Complete /
Complete–Partial
complete
indicates that at
least 1 switch has
its system MAC
and IP address
configured.
Complete
Partial Complete /
Complete
Complete
Partial Complete /
Complete
Not Started
Not Started
In-progress
Incomplete / Partial Complete /
Complete
Incomplete indicates that the AFM
is in the middle of deploying the
switches.
Complete indicates all the
switches in the distributed fabric
are deployed.
Not Started
Not Started
Not Started / In-
progress /
Stopped / Error /
Complete
Not Started / In-
progress /
Stopped / Error /
Complete
View Wiring Plan
Edit Fabric (All
fabric attributes
except fabric name)
Pre-deployment
Configuration
Delete Fabric
View Wiring Plan
Edit Fabric (All
fabric attributes
except fabric name)
Pre-deployment
Configuration
View DHCP
Configuration
Deploy and Validate
Fabric
View Deployment
and Validation
Status
Delete Fabric
View Wiring Plan
View DHCP
Configuration
View Deployment
and Validation
Status
Delete Fabric
View Wiring Plan
Edit Fabric—Allow
editing of all fabric
attributes except
fabric name, fabric
type interlink over-
subscription, port
count, and expand
fabric.
Expand Fabric—
Port Count and
uplink Configuration
(allow additions in
Configure Protocol
Setting)
Pre-deployment
Configuration
View DHCP
Configuration
Deploy and Validate
Fabric – Validation
is only allowed
when deployment is
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents