Pre-Deployment - Step 9: Output; Pre-Deployment - Step 10: Summary - Dell Active Fabric Manager Deployment Manual

Active fabric manager deployment guide 1.5
Hide thumbs Also See for Active Fabric Manager:
Table of Contents

Advertisement

Pre-Deployment – Step 9: Output
To review the uplinks or downlinks for each switch in the fabric, use the Pre-deployment Output screen.
To view the uplinks and downlinks for each switch in the fabric:
1. Navigate to the Network >
2. From the Deploy Fabric pull-down-menu, select the Pre-deployment Configuration option.
3. Navigate to the Output screen.
4. From the View pull-down menu, select one of the following options:
a. Downlink Output
b. Uplink Output
5. Click Export to export this information.
6. Click Next to go to the Summary screen.
NOTE: Only hardware inventory for the fabric interlinks (the connections between the spines and leaves)
display in the pre-deployment summary screen.
Pre-Deployment – Step 10: Summary
To review the pre-deployment configuration, use the Summary screen . This screen displays the following information:
Specified IP and protocol settings for the fabric, uplink, and downlink configuration
Software image information for each type of switch
Configuration file transfer status to the remote or local TFTP or FTP server
To view the pre-deployment configuration:
1.
Navigate to the Network >
2.
From the Deploy Fabric pull-down menu, select the Pre-deployment Configuration option.
3.
Navigate to the Summary screen.
4.
Carefully review the pre-deployment configuration before you commit it.
5.
Click Finished button to commit the your changes.
Next Steps:
1. Verify that the DHCP configuration file that you created for the fabric is integrated into the DHCP server so that the
switches are assigned a management IP address before you deploy the fabric.
2. Power on the switches in the fabric when you have completed the pre-deployment process. After you power cycle
the switches, the switches use bare metal provisioning (BMP).
Important: If you are using a switch that has already been deployed, you must reset its factory settings to use
it in the fabric. The switch must be in BMP mode. For more information about BMP, see
Step 7: DHCP Integration
CSPortal20/KnowledgeBase/Documentation.aspx . Select the Open Automation heading.
3. Navigate to the Network >
4. From the Deploy Fabric pull-down menu, to deploy and validate the fabric, select the Deploy and Validate option.
68
Fabric Name > Configure and Deploy screen.
Fabric Name > Configure and Deploy screen.
Open Automation Guide at https://www.force10networks.com/
and refer to the
Fabric Name > Configure and Deploy screen.
Pre-Deployment –

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents