6.
Click Next.
7.
In the Date/Time Range pull-down menu, select a date or time range using one of the following options. If you
select the custom range, specify a start and end date.
a) 30 days
b) 7 days
c) 24 hours
d) Custom Range
8.
Click Next.
9.
In the Monitors field, select which monitors to use for the report: CpuUtilization (CPU utilizatizaton), MemUtilization
(memory utilization), and then click the >> button.
10. In the Query field, to determine what nodes to include in the report for a fabric:
a) Select the core to query from the first pull-down menu.
b) Select the type of switches (spine and leaves) from the 2nd pull-down menu.
11. In the Available Nodes/Ports area, select the nodes to include in the report, and then click the >> button.
12. In Summary screen, review the report settings.
13. If you want to run the report now, check the Run Report Now option.
14. Click the Finish button.
Editing Reports
To edit a report:
1.
Navigate to the Network >
2.
Select the report to edit.
3.
Click the Edit button.
The Add/Modify Report screen displays.
4.
Edit the report. Click the Next button to navigate to different parts of the report.
5.
In the Summary area, review your changes.
6.
Click Finish.
Running Reports
Before you can run a report, schedule the data collection to start the task. For information on scheduling data collection,
see
Data
Collection.
To run a report:
1.
Navigate to the Network >
2.
Select the report to run.
3.
Click the Run button.
Duplicating Reports
To duplicate a report:
1.
Navigate to the Network >
2.
Select a report to duplicate.
3.
Click the Duplicate button.
Fabric Name > Reports screen.
Fabric Name > Reports screen.
Fabric Name > Reports screen.
107