3-2 Installing Server

INSTALLATION

This section describes installation of NEC Express5800/ft series.

Rack-mount Model

You can mount NEC Express5800/ft series on a rack that conforms to the EIA standards.
IMPORTANT:
NEC Express5800/ft series is a precision instrument. You should ask maintenance personnel
to install it.

Installing a rack

To install a rack, see the instruction that comes with the rack, or contact your sales agent or
maintenance personnel.
A room that can maintain the following
conditions:
[When operating]
Temperature: 10 to 35ºC*
Humidity: 20 to 80%
Temperature gradient: ±10ºC/hr
Atmospheric pressure: 749 to 1040hpa
[When not operating]
Temperature: 5 to 40ºC*
Humidity: 10 to 80%
Temperature gradient: ±15ºC/hr
Atmospheric pressure: 749 to 1040hpa
* It is recommended to use the server in a room where
temperature can be kept between 15 and 25ºC.
100V - 127 V or 200V - 240 V
parallel bi-polar power outlet
with grounding
Wall outlet within the reach
of supplied power cord.
Level and reinforced
floor.
Space 40 cm or more on top, 1 m or more on the
front and rear, and 60 cm or more on the right
and left.
Place where the rack is stabilized
by the stabilizer