Installing The Tower Conversion Kit (N8843-002) - NEC Express5800/320Fd-LR User Manual

Nec servers user's guide
Hide thumbs Also See for Express5800/320Fd-LR:
Table of Contents

Advertisement

INSTALLING the Tower Conversion Kit (N8843-002)

This section describes how to install the rack-mount model of NEC Express5800/ft series without
using the dedicated rack.
IMPORTANT:
NEC Express5800/ft series is a precision instrument. You should ask maintenance
personnel to install it.
Select a suitable site for tower model.
Observe the following precautions to use the equipment safely. There are risks
of a burn, injury, or damage to physical assets. For details, see "Notes for Safe
Handling" in Chapter 1.
 Remove all modules before moving the equipment.
 Do not install the equipment in non-designated places.
Close enough to connect
the keyboard and the
display.
Floor or a level
and robust
desk or table
Clean and tidy room
Location with an enough open space to
fully open the front bezel, at least 1 m
from the front, 50 cm .from the rear, and
15 cm from the sides of the server (The
front bezel extrudes about 50 mm from
the right side of the server when fully
opened.)
CAUTION
Uninterruptible Power Supply (UPS) to prevent momentary
voltage drop due to power failure or lightning *
* Optional. UPS is recommended for best use of features of NEC
Express5800/ft series.
* It is recommendable to use the server in a
room where temperature can be kept
between 15 and 25ºC.
Installing Server 3-13
Room that can maintain the following
conditions during server operation:
Temperature: 10 to 35ºC*
Humidity: 20 to 80% (non-condensing)
AC parallel bi-polar
power outlet with
grounding
Wall outlet within the
reach of supplied
power cord.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/320fd-mrN8800-125fExp320k

Table of Contents