Installing The Switch - Allied Telesis AT-FS201 Installation Manual

Fast ethernet switches
Hide thumbs Also See for AT-FS201:
Table of Contents

Advertisement

Installing the Switch

To install an AT-FS20x or AT-FS202SC/FSx Series Switches, perform the
following procedures:
1.
Remove all equipment from the package and store the packaging material
in a safe place.
Note
Do not remove the dust cover from the fiber optic port until you are
ready to connect the fiber optic cable. Dust contamination can adversely
impact the operating performance of the port and the switch.
2.
Attach the four protective feet (provided) to each corner of the bottom of
the unit. Do not attach the protective feet if you are installing the
switch in an AT-MCR12 chassis.
3.
Configure the DIP switches. Refer to Figure 3 on page 2 for the location of
the DIP switches and Table 6 for the possible settings.
DIP
Switch
Port
Number
1
2
2
1
3
2
4
2
Table 6 DIP Switch Settings
Setting
Position
Speed (Mbps)
Up
Down
Duplex Mode
Up
Down
Duplex Mode
Up
Down
Auto Neg
Up
Down
AT-FS20x and AT-FS202SC/FSx Series Installation Guide
Description
The twisted pair port is operating at 10 Mbps.
The twisted pair port is operating at 100 Mbps.
The fiber optic port is operating at half-duplex
mode.
The fiber optic is operating at full-duplex mode.
The twisted pair port is operating at half-duplex
mode.
The twisted pair port is operating at full-duplex
mode.
Auto-negotiation on the twisted pair port is
OFF.
Auto-negotiation on the twisted pair port is ON.
15

Advertisement

Table of Contents
loading

Table of Contents