Scheduling Recurring Or Resource-Intensive Jobs; Scheduling A Task - Adaptec Storage Manager User Manual

For direct attached storage
Hide thumbs Also See for Storage Manager:
Table of Contents

Advertisement

Scheduling a Task

If a task is lengthy and limits access to components on your storage space, you may want to set
a date and time for the task to complete, instead of running the task while there is activity on
your storage space.
If a task must be performed regularly, you can schedule it to recur at preset times.
You can schedule these Adaptec Storage Manager tasks:
Expanding a logical drive
Changing a logical drive's RAID level
Modifying the stripe size of a logical drive
Verifying a logical drive
Verifying and fixing a logical drive
To schedule one of these tasks:
1
Complete each step of the task until you are prompted to click Apply. (Don't click Apply.)
2
Click Schedule.
The schedule window opens. (The window you see may be different from the one shown
in this example, depending on which type of task you are scheduling.)
Chapter 7: Scheduling Recurring or Resource-Intensive Jobs
Schedule button
82

Advertisement

Table of Contents
loading

Table of Contents